NEWS
Cost of Olympic stadium conversion increases to £190m
POSTED 24 Oct 2014 . BY Tom Walker
The London Olympic Stadium will welcome West Ham United in 2016
The cost of converting the London Olympic Stadium into a 54,000-capacity multi-use stadium is set to rise from £154m to £190m due to complications in installing the new roof.

Providing the support structures for the new roof have required significantly more strengthening work to the main roof truss than initially expected. The truss was originally designed to be taken down after the Games.

As a result, the London Legacy Development Corporation (LLDC) has allocated an extra £35.9m for the project, increasing the total cost for the conversion to £189.9m.

When complete, the roof will cover 45,000sq m and will be 84m at its deepest point, the longest cantilevered roof in the world, covering every seat in the stadium and improving the acoustics and spectator experience.

The work on the Populous-designed stadium is being undertaken by Balfour Beatty, which will be given the extra funding to complete the job. Balfour Beatty signed the £154m contract ($246.7m €195.1m) in January 2014.

The additional costs will be funded by project contingencies and additional income generated by LLDC from its other “developments”. West Ham United Football Club (WHUFC), which will be the stadium’s main tenant when it moves in to the venue in 2016, will not be asked to contribute towards the added costs.

Rod Sheard, who lead the Populous team of architects that designed the iconic stadium, told Sports Management: “The transformation is progressing very well and, when complete, will be a wonderful stadium.

“It will retain much of its recognisable charm from the London Olympics as well as its operational requirements for athletics and other field sports but also have the ability to be a fine football stadium for the West Ham supporters.”

The stadium will host five matches during the Rugby World Cup 2015 as well as the 2017 IAAF World Championships and 2017 IPC World Athletics Championships – the first time these global events have been staged in the same venue in the same year.
RELATED STORIES
  French operator Vinci appointed to manage London’s Olympic Stadium


Vinci Stadium, subsidiary of French venue operator Vinci Concessions, has signed a 25-year contract to operate London’s Olympic Stadium.
  New-look Olympic Stadium ready for Rugby World Cup debut


A re-configured London Olympic Stadium will host its first major event since its radical £272m (US$424m, €390m) transformation when France line up against Romania for a Rugby World Cup game tonight.
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - Cost of Olympic stadium conversion increases to £190m...
25 Apr 2024 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

24 Oct 2014

Cost of Olympic stadium conversion increases to £190m
BY Tom Walker

The London Olympic Stadium will welcome West Ham United in 2016

The London Olympic Stadium will welcome West Ham United in 2016

The cost of converting the London Olympic Stadium into a 54,000-capacity multi-use stadium is set to rise from £154m to £190m due to complications in installing the new roof.

Providing the support structures for the new roof have required significantly more strengthening work to the main roof truss than initially expected. The truss was originally designed to be taken down after the Games.

As a result, the London Legacy Development Corporation (LLDC) has allocated an extra £35.9m for the project, increasing the total cost for the conversion to £189.9m.

When complete, the roof will cover 45,000sq m and will be 84m at its deepest point, the longest cantilevered roof in the world, covering every seat in the stadium and improving the acoustics and spectator experience.

The work on the Populous-designed stadium is being undertaken by Balfour Beatty, which will be given the extra funding to complete the job. Balfour Beatty signed the £154m contract ($246.7m €195.1m) in January 2014.

The additional costs will be funded by project contingencies and additional income generated by LLDC from its other “developments”. West Ham United Football Club (WHUFC), which will be the stadium’s main tenant when it moves in to the venue in 2016, will not be asked to contribute towards the added costs.

Rod Sheard, who lead the Populous team of architects that designed the iconic stadium, told Sports Management: “The transformation is progressing very well and, when complete, will be a wonderful stadium.

“It will retain much of its recognisable charm from the London Olympics as well as its operational requirements for athletics and other field sports but also have the ability to be a fine football stadium for the West Ham supporters.”

The stadium will host five matches during the Rugby World Cup 2015 as well as the 2017 IAAF World Championships and 2017 IPC World Athletics Championships – the first time these global events have been staged in the same venue in the same year.



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
US spa industry hits record-breaking US$21.3 billion in revenue in 2023
US spa industry hits record-breaking US$21.3 billion in revenue in 2023   24 Apr 2024

The US spa industry is continuing its upward trajectory, achieving an unprecedented milestone with a record-breaking revenue of US$21.3 billion in .... more>>
Immediate rewards can motivate people to exercise, finds new research
Immediate rewards can motivate people to exercise, finds new research   24 Apr 2024

Short-term incentives to exercise, such as using daily reminders, rewards or games, can lead to sustained increases in activity, according to new .... more>>
Shannon Malave appointed spa director at Mohonk Mountain House
Shannon Malave appointed spa director at Mohonk Mountain House   24 Apr 2024

Spa and wellness veteran Shannon Malave has been named spa director at iconic US spa destination Mohonk Mountain House. Based in New York’s verdant .... more>>
Six Senses unveils urban wellness retreat in Kyoto inspired by Japanese Zen culture
Six Senses unveils urban wellness retreat in Kyoto inspired by Japanese Zen culture   23 Apr 2024

Six Senses Kyoto opens its doors today, marking the eco-luxury hotel and spa operator’s entry into Japan and a new addition to its urban collection. .... more>>
RSG opens flagship John Reed in Berlin, as its builds out its 'world city' portfolio
RSG opens flagship John Reed in Berlin, as its builds out its 'world city' portfolio   23 Apr 2024

With the launch of its 49th John Reed, RSG Group is looking for more opportunities for its high-end brand in the US and Europe. Cosmopolitan cities .... more>>
PureGym's new results set it up for accelerating growth
PureGym's new results set it up for accelerating growth   23 Apr 2024

PureGym saw revenues rise by 15 per cent in 2023, with the company announcing plans to develop 200 new clubs in the next three to four years. .... more>>
Company profile


PSLT Ltd

PSLT Fitness Solutions manufacture, remanufacture and buy back commercial gym equipment.

View full profile>>

Catalogue gallery


Featured Supplier

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Discover how to prepare your spa or wellness facility for the influx of international guests and meet global standards as tourism in Saudi Arabia surges. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Fitness Motivator and Personal Trainer
Location: Market Rasen
Company: Everyone Active
Recreation Assistant (Dry Site)
Salary: Competitive
Location: Market Rasen
Company: Everyone Active
Party Leader
Salary: Competitive
Location: Gainsborough
Company: Everyone Active
Diary dates
Powered by leisurediary.com




23-25 Apr 2024

ISPA Conference 2024

Phoenix Convention Center, Phoenix, United States







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd