NEWS
Houston's Holocaust Museum unveils US$33.8m expansion
POSTED 22 Jun 2017 . BY Tom Anstey
Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record Credit: Mucasey & Associates
Houston’s Holocaust Museum has announced plans to nearly triple in size following a US$15m (€13.5m, £11.8m) gift from longtime patrons Lester and Sue Smith.

The Smith’s donation goes towards the museum’s ongoing US$49.4m (€43.9m, £39.6m) capital fundraising campaign, which includes in addition to costs for the redevelopment, US$11.7m (€10.5m, £9.2m) in endowment funds.

Expanding in size to 57,000sq ft (5,300sq m), the US$33.8m (€30.3m, £26.6m) expansion will see two thirds of the existing building razed to the ground to make way for a new three-storey structure housing exhibits, classrooms, library space and administrative offices.

The first floor will contain the Human Rights Gallery, which will feature a new Interfaith Hall of Reflection. The gallery will also include a space for students to learn about human rights and genocide during the 20th and 21st centuries and a Call to Action exhibit, where visitors are challenged to engage with one another to understand the choices that a person can make to combat hatred. The first floor will also feature a permanent exhibit dedicated to Anne Frank and other youth diarists to educate visitors about the stories of the Holocaust.

The Moral Choices Hall on the second floor, will act as the “heart” of the museum, with programmes based on reminding visitors of the choices they remain free to make. The Moral Choices Hall also features the three-story Butterfly Loft, where butterflies symbolize the 1.5 million children who died during the Holocaust.

Also on on the second floor, The Samuel Bak Gallery and Learning Center will serve as a permanent collection of 129 of it namesake’s paintings, donated to the museum by the artist – a Holocaust survivor and painter. The floor will also be home to an expanded auditorium, which can seat 200 people.

The third floor is an expansion of the museum’s library, which will allow for enhanced public access to a collection of 285 oral testimonies for research purposes and genealogical searches. The library will also include more than 10,000 volumes and resources for in-house research and education.

"The expansion will give us the opportunity to serve substantially more students each year," said Dr. Kelly J. Zúñiga, museum CEO. "Expanded exhibits, complete with bilingual English/Spanish signage, will increase student field trip attendance by 50 per cent in the first year alone, and are projecting that our overall attendance will grow by nearly 35 per cent.”

Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record. Exhibition and media design will be handled by Ralph Appelbaum Associates. McCarthy Building Companies are general contractors.

During construction, which is scheduled to begin in October and be completed in early 2019, the museum will temporarily relocate most of its permanent exhibits. The museum will close on 24 July in preparation for the move to 9220 Kirby Drive, Suite 100, where it will open on 5 September.
The museum will expand to 57,000sq ft in size Credit: Mucasey & Associates
The Butterfly Loft, symbolises the 1.5 million children who died during the Holocaust Credit: Mucasey & Associates
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - Houston's Holocaust Museum unveils US$33.8m expansion...
25 Apr 2024 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

22 Jun 2017

Houston's Holocaust Museum unveils US$33.8m expansion
BY Tom Anstey

Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record

Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record
photo: Mucasey & Associates

Houston’s Holocaust Museum has announced plans to nearly triple in size following a US$15m (€13.5m, £11.8m) gift from longtime patrons Lester and Sue Smith.

The Smith’s donation goes towards the museum’s ongoing US$49.4m (€43.9m, £39.6m) capital fundraising campaign, which includes in addition to costs for the redevelopment, US$11.7m (€10.5m, £9.2m) in endowment funds.

Expanding in size to 57,000sq ft (5,300sq m), the US$33.8m (€30.3m, £26.6m) expansion will see two thirds of the existing building razed to the ground to make way for a new three-storey structure housing exhibits, classrooms, library space and administrative offices.

The first floor will contain the Human Rights Gallery, which will feature a new Interfaith Hall of Reflection. The gallery will also include a space for students to learn about human rights and genocide during the 20th and 21st centuries and a Call to Action exhibit, where visitors are challenged to engage with one another to understand the choices that a person can make to combat hatred. The first floor will also feature a permanent exhibit dedicated to Anne Frank and other youth diarists to educate visitors about the stories of the Holocaust.

The Moral Choices Hall on the second floor, will act as the “heart” of the museum, with programmes based on reminding visitors of the choices they remain free to make. The Moral Choices Hall also features the three-story Butterfly Loft, where butterflies symbolize the 1.5 million children who died during the Holocaust.

Also on on the second floor, The Samuel Bak Gallery and Learning Center will serve as a permanent collection of 129 of it namesake’s paintings, donated to the museum by the artist – a Holocaust survivor and painter. The floor will also be home to an expanded auditorium, which can seat 200 people.

The third floor is an expansion of the museum’s library, which will allow for enhanced public access to a collection of 285 oral testimonies for research purposes and genealogical searches. The library will also include more than 10,000 volumes and resources for in-house research and education.

"The expansion will give us the opportunity to serve substantially more students each year," said Dr. Kelly J. Zúñiga, museum CEO. "Expanded exhibits, complete with bilingual English/Spanish signage, will increase student field trip attendance by 50 per cent in the first year alone, and are projecting that our overall attendance will grow by nearly 35 per cent.”

Architects Mucasey & Associates (M&A) are behind the LEED certified masterplan, with international design firm PGAL acting as architects of record. Exhibition and media design will be handled by Ralph Appelbaum Associates. McCarthy Building Companies are general contractors.

During construction, which is scheduled to begin in October and be completed in early 2019, the museum will temporarily relocate most of its permanent exhibits. The museum will close on 24 July in preparation for the move to 9220 Kirby Drive, Suite 100, where it will open on 5 September.



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
US spa industry hits record-breaking US$21.3 billion in revenue in 2023
US spa industry hits record-breaking US$21.3 billion in revenue in 2023   24 Apr 2024

The US spa industry is continuing its upward trajectory, achieving an unprecedented milestone with a record-breaking revenue of US$21.3 billion in .... more>>
Immediate rewards can motivate people to exercise, finds new research
Immediate rewards can motivate people to exercise, finds new research   24 Apr 2024

Short-term incentives to exercise, such as using daily reminders, rewards or games, can lead to sustained increases in activity, according to new .... more>>
Shannon Malave appointed spa director at Mohonk Mountain House
Shannon Malave appointed spa director at Mohonk Mountain House   24 Apr 2024

Spa and wellness veteran Shannon Malave has been named spa director at iconic US spa destination Mohonk Mountain House. Based in New York’s verdant .... more>>
Six Senses unveils urban wellness retreat in Kyoto inspired by Japanese Zen culture
Six Senses unveils urban wellness retreat in Kyoto inspired by Japanese Zen culture   23 Apr 2024

Six Senses Kyoto opens its doors today, marking the eco-luxury hotel and spa operator’s entry into Japan and a new addition to its urban collection. .... more>>
RSG opens flagship John Reed in Berlin, as its builds out its 'world city' portfolio
RSG opens flagship John Reed in Berlin, as its builds out its 'world city' portfolio   23 Apr 2024

With the launch of its 49th John Reed, RSG Group is looking for more opportunities for its high-end brand in the US and Europe. Cosmopolitan cities .... more>>
PureGym's new results set it up for accelerating growth
PureGym's new results set it up for accelerating growth   23 Apr 2024

PureGym saw revenues rise by 15 per cent in 2023, with the company announcing plans to develop 200 new clubs in the next three to four years. .... more>>
Company profile


QubicaAMF UK

QubicaAMF is the largest and most innovative bowling equipment provider with 600 employees worldwide.

View full profile>>

Catalogue gallery


Featured Supplier

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Discover how to prepare your spa or wellness facility for the influx of international guests and meet global standards as tourism in Saudi Arabia surges. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Fitness Motivator and Personal Trainer
Location: Market Rasen
Company: Everyone Active
Recreation Assistant (Dry Site)
Salary: Competitive
Location: Market Rasen
Company: Everyone Active
Party Leader
Salary: Competitive
Location: Gainsborough
Company: Everyone Active
Diary dates
Powered by leisurediary.com




23-25 Apr 2024

ISPA Conference 2024

Phoenix Convention Center, Phoenix, United States







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd