NEWS
FaulknerBrowns create twisting 'Tardis-like' sports campus in The Hague's historic Zuiderpark
POSTED 19 Mar 2018 . BY Kim Megson
Architecture firm FaulknerBrowns have completed a dynamic €50m (US$61m, £44.4m) sports campus in the Hague’s historic Zuiderpark Credit: Scagliola Brakkee
We were wowed by the material. As you walk around the building, the light constantly shifts, reflecting the sky and the trees. It changes as lighting conditions and cloud patterns alter throughout the day
– Russ Davenport, FaulknerBrowns
Architecture firm FaulknerBrowns have completed a dynamic €50m (US$61m, £44.4m) sports campus in The Hague’s historic Zuiderpark.

Open to amateur and elite athletes and community users, the 34,000sq m (366,000sq ft) facility includes a gymnastics hall, beach sports venue, 3,500 capacity arena and a multi-purpose sports hall, as well as a variety of sports science and education spaces, including a public library. Outside, there are a series of multi-use pitches, while an animated entrance courtyard acts as an extension to the park, which is listed as a national monument.

The building, called Sportcampus Zuiderpark, occupies a site that was once home to the stadium of Dutch football club Den Haag FC. That ground was demolished in 2007 when the team moved to the larger Kyocera Stadium, designed by Zwarts & Jansma Architects.

Backing for the new campus has come from the city municipality, the Hague University of Applied Sciences and the ROC Mondriaan vocational school – with the trio stating the need for the city to have a modern, well-equipped home to train and develop sporting talent.
FaulknerBrowns – who have designed large-scale facilities across the UK and Europe – overcame five other bids to win the project in an international design competition held in 2012.

“Back when we won the project, the Netherlands and the other Benelux countries were considering a bid for the 2028 Olympics and their plans were focused on health, wellbeing and youth,” FaulknerBrowns partner Russ Davenport told CLAD.

“The clients wanted to reflect that by building something much broader than just a facility for sport. They wanted to emphasise the importance of sport and exercise through learning and engagement. Our design had to support that kind of aspirational ethos.”

To achieve this, the team were tasked with capturing a sense of movement.

“Movement was a fundamental concept for the project, but it was a very difficult thing to create internally, because a lot of the volumes are square boxes,” said Davenport. “Externally, though, we felt that a curving form would fulfil that ambition.

“Conceptually, we came up with this idea of having a cluster of boxes that are tied together by a ribbon that twists and changes in height. At the rear, the high-sided elevation responds to the urban element of the site, while the lower front elevation responds at a human scale to the public parkland.

“We angled the façades in the vertical plane as well as the horizontal. It allows air in and out and provides sun shading to parts of the building, so it’s functional and not just decorative. It also has the effect of diminishing the size of the building in the park. Whenever you’re looking at it, the elevation is running away from you, so it never looks quite as big as it really is. It’s like the Tardis.”

According to Davenport, the brightly polished stainless steel façade was selected to create a sense of materiality and dynamism.

“We were wowed by the material. As you walk around the building, the light constantly shifts, reflecting the sky and the trees. It changes as lighting conditions and cloud patterns alter throughout the day.

“I’ve heard a few nicknames for it already – the UFO and the Pebble – but we’ve been amazed by the positive response. Usually, buildings of this type get a split reaction and we’ve not had any bad press whatsoever. No one has come out and said they don’t think it’s the right building, and for me, that speaks volumes.

It was really important for us to get the right feel and image for this site,” concludes Davenport. “That was our biggest challenge.”


In the spotlight

FaulknerBrowns on mixing sport and sustainability


“The municipality of The Hague has the ambition to be climate neutral by 2040. This informed the client’s desire for a sustainable campus.

“The building is designed to be as compact as possible whilst providing the necessary space for the range of sport and education facilities. This, combined with a well-insulated shell, minimises energy loss. The 20,000sq m (215,200sq ft) roof is covered with over 15,000 (161,400sq ft) of heat-regulating green sedum, as well as photovoltaic solar panels to generate energy for the building, and solar collectors to produce hot water for the showers.

“The energy generated by the roof is supplemented by a groundwater heating and cooling system which utilises two wells excavated to different depths. In the summer when there is a demand for cooling, groundwater is pumped from the shallower ‘cold’ water well and fed through a heat exchanger to provide cooling for the building. Due to this energy transfer the water returns warmed and is fed back into the deeper ‘warm’ water well. In the winter the system is reversed to provide heating for the building.”


Open to amateur and elite athletes and community users, the 34,000sq m (366,000sq ft) facility includes a gymnastics hall, beach sports venue, 3,500 capacity arena and a multi-purpose sports hall Credit: Scagliola Brakkee
Sportcampus Zuiderpark occupies a site that was once home to the stadium of Dutch football club Den Haag FC Credit: Scagliola Brakkee
The building was completed in 2017 Credit: Scagliola Brakkee
Backing for the new campus has come from the city municipality, the Hague University of Applied Sciences and the ROC Mondriaan vocational school Credit: Scagliola Brakkee
FaulknerBrowns – who have designed large-scale facilities across the UK and Europe – overcame five other bids to win the project in an international design competition held in 2012 Credit: Scagliola Brakkee
Outside, there are a series of multi-use pitches, while an animated entrance courtyard acts as an extension to the park, which is listed as a national monument Credit: Scagliola Brakkee
Credit: Hufton+Crow
Credit: Scagliola Brakkee
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Scagliola Brakkee
Credit: Scagliola Brakkee
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Hufton+Crow
Credit: Scagliola Brakkee
Credit: Hufton+Crow
RELATED STORIES
  FEATURE: Sports: Sportcampus Zuiderpark


FaulknerBrowns’ Dutch sports facility
  FaulknerBrowns-designed modular swimming complex given planning permission in Derby


A new £33m modular leisure complex, housing an Olympic-sized swimming pool, has been given the green light by Derby City Council.
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - FaulknerBrowns create twisting 'Tardis-like' sports campus in The Hague's historic Zuiderpark...
16 Apr 2024 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

19 Mar 2018

FaulknerBrowns create twisting 'Tardis-like' sports campus in The Hague's historic Zuiderpark
BY Kim Megson

Architecture firm FaulknerBrowns have completed a dynamic €50m (US$61m, £44.4m) sports campus in the Hague’s historic Zuiderpark

Architecture firm FaulknerBrowns have completed a dynamic €50m (US$61m, £44.4m) sports campus in the Hague’s historic Zuiderpark
photo: Scagliola Brakkee

Architecture firm FaulknerBrowns have completed a dynamic €50m (US$61m, £44.4m) sports campus in The Hague’s historic Zuiderpark.

Open to amateur and elite athletes and community users, the 34,000sq m (366,000sq ft) facility includes a gymnastics hall, beach sports venue, 3,500 capacity arena and a multi-purpose sports hall, as well as a variety of sports science and education spaces, including a public library. Outside, there are a series of multi-use pitches, while an animated entrance courtyard acts as an extension to the park, which is listed as a national monument.

The building, called Sportcampus Zuiderpark, occupies a site that was once home to the stadium of Dutch football club Den Haag FC. That ground was demolished in 2007 when the team moved to the larger Kyocera Stadium, designed by Zwarts & Jansma Architects.

Backing for the new campus has come from the city municipality, the Hague University of Applied Sciences and the ROC Mondriaan vocational school – with the trio stating the need for the city to have a modern, well-equipped home to train and develop sporting talent.
FaulknerBrowns – who have designed large-scale facilities across the UK and Europe – overcame five other bids to win the project in an international design competition held in 2012.

“Back when we won the project, the Netherlands and the other Benelux countries were considering a bid for the 2028 Olympics and their plans were focused on health, wellbeing and youth,” FaulknerBrowns partner Russ Davenport told CLAD.

“The clients wanted to reflect that by building something much broader than just a facility for sport. They wanted to emphasise the importance of sport and exercise through learning and engagement. Our design had to support that kind of aspirational ethos.”

To achieve this, the team were tasked with capturing a sense of movement.

“Movement was a fundamental concept for the project, but it was a very difficult thing to create internally, because a lot of the volumes are square boxes,” said Davenport. “Externally, though, we felt that a curving form would fulfil that ambition.

“Conceptually, we came up with this idea of having a cluster of boxes that are tied together by a ribbon that twists and changes in height. At the rear, the high-sided elevation responds to the urban element of the site, while the lower front elevation responds at a human scale to the public parkland.

“We angled the façades in the vertical plane as well as the horizontal. It allows air in and out and provides sun shading to parts of the building, so it’s functional and not just decorative. It also has the effect of diminishing the size of the building in the park. Whenever you’re looking at it, the elevation is running away from you, so it never looks quite as big as it really is. It’s like the Tardis.”

According to Davenport, the brightly polished stainless steel façade was selected to create a sense of materiality and dynamism.

“We were wowed by the material. As you walk around the building, the light constantly shifts, reflecting the sky and the trees. It changes as lighting conditions and cloud patterns alter throughout the day.

“I’ve heard a few nicknames for it already – the UFO and the Pebble – but we’ve been amazed by the positive response. Usually, buildings of this type get a split reaction and we’ve not had any bad press whatsoever. No one has come out and said they don’t think it’s the right building, and for me, that speaks volumes.

It was really important for us to get the right feel and image for this site,” concludes Davenport. “That was our biggest challenge.”


In the spotlight

FaulknerBrowns on mixing sport and sustainability


“The municipality of The Hague has the ambition to be climate neutral by 2040. This informed the client’s desire for a sustainable campus.

“The building is designed to be as compact as possible whilst providing the necessary space for the range of sport and education facilities. This, combined with a well-insulated shell, minimises energy loss. The 20,000sq m (215,200sq ft) roof is covered with over 15,000 (161,400sq ft) of heat-regulating green sedum, as well as photovoltaic solar panels to generate energy for the building, and solar collectors to produce hot water for the showers.

“The energy generated by the roof is supplemented by a groundwater heating and cooling system which utilises two wells excavated to different depths. In the summer when there is a demand for cooling, groundwater is pumped from the shallower ‘cold’ water well and fed through a heat exchanger to provide cooling for the building. Due to this energy transfer the water returns warmed and is fed back into the deeper ‘warm’ water well. In the winter the system is reversed to provide heating for the building.”





Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Clinique La Prairie to operate health resort at Tri Vananda in Phuket
Clinique La Prairie to operate health resort at Tri Vananda in Phuket   16 Apr 2024

Swiss longevity brand Clinique La Prairie (CLP) has inked a deal with Montara Hospitality Group to operate a resort at Tri Vananda – a purpose-built .... more>>
UK Active Awards for excellence open for nominations
UK Active Awards for excellence open for nominations   16 Apr 2024

UK Active has announced details of its annual health and fitness industry awards ceremony, which will take place in Birmingham on the evening of .... more>>
Six Senses La Sagesse launches with lagoon-fronted spa inspired by Caribbean fishing villages
Six Senses La Sagesse launches with lagoon-fronted spa inspired by Caribbean fishing villages   15 Apr 2024

Six Senses has announced the grand opening of its first-ever property and spa in the Caribbean, called Six Senses La Sagesse. With a picturesque .... more>>
Basic-Fit trials corporate wellness drive across its Spanish clubs
Basic-Fit trials corporate wellness drive across its Spanish clubs   15 Apr 2024

Basic-Fit has signed up to trial Wellhub across its recently expanded Spanish network, giving access to subscribers and enabling them to use all 152 .... more>>
Go Fit CEO, Mário Barbosa, unveils expansion plans in this month’s HCM
Go Fit CEO, Mário Barbosa, unveils expansion plans in this month’s HCM   15 Apr 2024

Having redefined the model of public-private collaboration in Spain, Go Fit is now expanding into Italy and has ambitious plans to grow its estate, .... more>>
US$60m Zion Canyon Hot Springs project breaks ground in Southern Utah
US$60m Zion Canyon Hot Springs project breaks ground in Southern Utah   12 Apr 2024

A brand new desert hot springs oasis, called Zion Canyon Hot Springs, is set to open in Southern Utah in Q3 of 2025. Situated 30 minutes from the .... more>>
Company profile


iPlayCO

iPlayCo was established in 1999.

View full profile>>

Catalogue gallery


Featured Supplier

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Elevate your spa business: master global standards and thrive in Saudi Arabia's tourism boom

Discover how to prepare your spa or wellness facility for the influx of international guests and meet global standards as tourism in Saudi Arabia surges. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Personal Training - Let us help get you qualified to join our team
Location: Nationwide
Company: Everyone Active
Recreation Assistant
Salary: Competitive salary
Location: Wigston
Company: Everyone Active
Duty Manager (Dry)
Salary: Competitive salary
Location: Bournemouth
Company: Everyone Active
Diary dates
Powered by leisurediary.com




21-21 Apr 2024

Below the Belt Melbourne Pedalthon

Sandown Racecourse , Springvale , Australia







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd