NEWS
SFO-based EHDD Architects complete Toledo Zoo aquarium's US$25m redevelopment
POSTED 27 Mar 2015 . BY Tom Anstey
Stingrays feature a significant part of the redeveloped aquarium Credit: Shutterstock.com
Ohio’s Toledo Zoo has today (27 March) reopened its aquarium following a near three-year, US$25m (€21.5m, £16.4m) renovation, which has seen the interior of the historic facility revamped to provide a brand new, world-class visitor experience.

The aquarium, which first opened in 1939, was closed in 2012 for the renovations. The new development has almost tripled the amount of water inside the aquarium.

The building’s historic exterior architecture, by the Works Progress Administration, has been preserved during the construction phase. For the renovation, San Francisco-based EHDD was selected in 2010 as project architect, while local firm Rudolph-Libbe worked as construction manager.



The aquarium’s new saltwater Pacific Reef holds 90,000 gallons of water – nearly 12 times the size of the aquarium’s previous largest tank. In addition, two touch tanks will allow visitors to interact with an array of sea creatures, including sharks and stingrays and a display of South African penguins. In total, the aquarium will house 32 main exhibits, plus further small tanks.

“It’s a real public aquarium now, it’s not a small zoo aquarium like it was,” said aquarium curator, Jay Hemdal, speaking to the Toledo Blade. “An aquarium fits in really well with our mission [as a zoo], which is to inspire our visitors and to educate and entertain.

“We did maintain zone geography which means the fish that are exhibited together are found in the same region. The Pacific Reef has animals from the Pacific, while the Gulf of Mexico [tank] has animals from the gulf,” he continued.

“If we’ve done our job correctly, we’ve excited them and inspired them to go out and make a difference in terms of aquatic conservation once they leave. We want people to have an enjoyable time. If you learn something along the way, that’s great.”

Around 80 per cent of the project was funded by a tax levy from Lucas County, with the remaining 20 per cent coming from private donations.
PROJECT PROFILE:

Toledo Zoo aquarium renovation
Toledo Zoo in Ohio is entering the final stages before reopening its aquarium after a three-year, US$25m (€21.5m, £16.4m) renovation, which has seen the interior of the historic facility completely renovated.

Location: Toledo , United States
Budget: US$25m

RELATED STORIES
  Toledo Zoo's US$25m aquarium renovation nearly complete


Toledo Zoo in Ohio is entering the final stages of a three-year, US$25m (€21.5m, £16.4m) renovation of its aquarium, which has seen the interior of the historic facility completely renovated.
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - SFO-based EHDD Architects complete Toledo Zoo aquarium's US$25m redevelopment...
08 Jun 2026 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

27 Mar 2015

SFO-based EHDD Architects complete Toledo Zoo aquarium's US$25m redevelopment
BY Tom Anstey

Stingrays feature a significant part of the redeveloped aquarium

Stingrays feature a significant part of the redeveloped aquarium
photo: Shutterstock.com

Ohio’s Toledo Zoo has today (27 March) reopened its aquarium following a near three-year, US$25m (€21.5m, £16.4m) renovation, which has seen the interior of the historic facility revamped to provide a brand new, world-class visitor experience.

The aquarium, which first opened in 1939, was closed in 2012 for the renovations. The new development has almost tripled the amount of water inside the aquarium.

The building’s historic exterior architecture, by the Works Progress Administration, has been preserved during the construction phase. For the renovation, San Francisco-based EHDD was selected in 2010 as project architect, while local firm Rudolph-Libbe worked as construction manager.



The aquarium’s new saltwater Pacific Reef holds 90,000 gallons of water – nearly 12 times the size of the aquarium’s previous largest tank. In addition, two touch tanks will allow visitors to interact with an array of sea creatures, including sharks and stingrays and a display of South African penguins. In total, the aquarium will house 32 main exhibits, plus further small tanks.

“It’s a real public aquarium now, it’s not a small zoo aquarium like it was,” said aquarium curator, Jay Hemdal, speaking to the Toledo Blade. “An aquarium fits in really well with our mission [as a zoo], which is to inspire our visitors and to educate and entertain.

“We did maintain zone geography which means the fish that are exhibited together are found in the same region. The Pacific Reef has animals from the Pacific, while the Gulf of Mexico [tank] has animals from the gulf,” he continued.

“If we’ve done our job correctly, we’ve excited them and inspired them to go out and make a difference in terms of aquatic conservation once they leave. We want people to have an enjoyable time. If you learn something along the way, that’s great.”

Around 80 per cent of the project was funded by a tax levy from Lucas County, with the remaining 20 per cent coming from private donations.



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Longevitix launches AI-powered platform to deliver longevity medicine at scale
Longevitix launches AI-powered platform to deliver longevity medicine at scale   08 Jun 2026

Longevitix, a clinical platform for preventive and longevity medicine, has launched its AI-powered intelligence system to help physicians deliver .... more>>

Orangetheory set for Italian expansion and Technogym tie-up
Orangetheory set for Italian expansion and Technogym tie-up   08 Jun 2026

Purpose Brands has announced its entry into the Italian market, having sold the franchise rights for four Orangetheory Fitness studios to Icon .... more>>

Atmantan Wellness Centre announces new wellness destination in Hyderabad
Atmantan Wellness Centre announces new wellness destination in Hyderabad   08 Jun 2026

Atmantan Wellness Centre, an integrative wellness destination in Mulshi, near Pune in India, is expanding its portfolio by adding a new centre in .... more>>

Fitness First adds red light therapy to relaxation classes
Fitness First adds red light therapy to relaxation classes   08 Jun 2026

Fitness First UK is integrating red light therapy into its yoga and Pilates classes through a partnership with Bon Charge.

....
more>>
The Retreat Costa Rica debuts Vida Mía Longevity Centre
The Retreat Costa Rica debuts Vida Mía Longevity Centre   07 Jun 2026

Luxury wellness resort, The Retreat Costa Rica, has introduced its Vida Mía Longevity Centre at the property’s Vida Mía Healing Centre and .... more>>

Almost half of spa survey respondents are unaware cancer is a disability and not adapting treatments is discrimination
Almost half of spa survey respondents are unaware cancer is a disability and not adapting treatments is discrimination   05 Jun 2026

A recent survey by the UK Spa Association (UKSA) into the industry’s approach to cancer care has revealed that almost half of participating .... more>>

Company profile


Total Vibration Solutions Ltd (TVS Group)

TVS Group includes TVS Sports Surfaces, TVS Gym Flooring, TVS Play Surfaces and TVS Acoustics.

View full profile>>

Catalogue gallery


Featured Supplier

Endospheres' new protocols are designed to meet real client needs

Endospheres' new protocols are designed to meet real client needs

Spa professionals see it every day: clients are arriving with more complex expectations. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Membership Advisor
Salary: Competitive salary plus commission & benefits
Location: Market Rasen
Company: Everyone Active
Customer Service Advisor
Salary: Competitive
Location: Market Rasen
Company: Everyone Active
GP Exercise Referral Instructor
Salary: £33,000pa + benefits
Location: Harrow
Company: Everyone Active
Diary dates
Powered by leisurediary.com

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd