NEWS
Surf Snowdonia, with architecture by seven, to be world first for new Wave Garden surf generator
POSTED 20 Apr 2015 . BY Liz Terry
Architects seven have designed the main Hub Building with a 50m-long glazed elevation overlooking the surfing lake
Surf Snowdonia, a massive surf facility in north Wales, UK, has announced an opening date of July 2015. Architects seven have been working alongside the master-planning team to design the buildings.

The outdoor adventure destination features a 30,000sq m (322,000sq ft) lagoon – with waves courtesy of Spanish wave technology company Wave Garden. It will be the world's first commercial application of the technology.

The lake will have a central pontoon housing an underwater ‘plough’ that creates a 2m (6.6ft) high wave once every minute over the length of the 300 metre (984 foot) lagoon. Up to 52 surfers can be accommodated in the lagoon at one time, with rides lasting about 18 seconds.

The £12m ($18m, €16.6m) Surf Snowdonia development will cater for surfers of all levels, with its own surf academy teaching surfing, bodyboarding, kayaking, stand-up paddleboarding (SUP), surf yoga, surf fitness and open-water swimming. It will also have a media compound for international competitions.

About 75,000 visitors are expected each year.

seven have designed the main Hub Building with a 50m (164ft) long glazed elevation overlooking the surfing lake, giving spectators clear views of the action from the restaurant and retail spaces. The building also contains the main reception, equipment hire and changing facilities.

The Family Activity Building contains a multi-decked children’s assault course and coffee shop overlooking the activity lagoon to enable spectators to watch ‘blobbing’ and the waterslides.

The Camp Site Amenity Building houses the campsite reception and office, lifeguard welfare facilities and WCs / showers for campers. There will also be camping accommodation and sleeping ‘pods’ located along the lake’s waterfront.

Visitors can try the obstacle course, equipped with inflatables and overhangs, at the activity lagoon. Catering includes a lagoon-side café, restaurant and bar serving locally sourced food.

Larger lodges will also be built and will retain the natural character of the woodlands surrounding the lake.

Despite the majestic surroundings, the facility is being built on the site of a former aluminium factory. Surf Snowdonia is recycling and re-using the materials on the construction site and using 100 per cent rainwater to fill the surf lake.

Surf Snowdonia is being developed by Conwy Adventure Leisure Ltd. There have previously been a number of proposals for adventure sports developments in Snowdonia, but most have remained on the drawing board.
RELATED STORIES
  Surf Snowdonia gets final approval for north Wales site


Plans for a huge surf facility in Snowden, north Wales have been given the go- ahead after gaining unanimous consent from Conwy County Borough councillors.
  Snowdonia's indoor snow dome deemed feasible


Accountants PriceWaterhouseCoopers (PWC) has completed the first stage of its feasibility study of the £165m indoor ski dome proposed for Snowdonia.
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - Surf Snowdonia, with architecture by seven, to be world first for new Wave Garden surf generator...
09 Jun 2026 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

20 Apr 2015

Surf Snowdonia, with architecture by seven, to be world first for new Wave Garden surf generator
BY Liz Terry

Architects seven have designed the main Hub Building with a 50m-long glazed elevation overlooking the surfing lake

Architects seven have designed the main Hub Building with a 50m-long glazed elevation overlooking the surfing lake

Surf Snowdonia, a massive surf facility in north Wales, UK, has announced an opening date of July 2015. Architects seven have been working alongside the master-planning team to design the buildings.

The outdoor adventure destination features a 30,000sq m (322,000sq ft) lagoon – with waves courtesy of Spanish wave technology company Wave Garden. It will be the world's first commercial application of the technology.

The lake will have a central pontoon housing an underwater ‘plough’ that creates a 2m (6.6ft) high wave once every minute over the length of the 300 metre (984 foot) lagoon. Up to 52 surfers can be accommodated in the lagoon at one time, with rides lasting about 18 seconds.

The £12m ($18m, €16.6m) Surf Snowdonia development will cater for surfers of all levels, with its own surf academy teaching surfing, bodyboarding, kayaking, stand-up paddleboarding (SUP), surf yoga, surf fitness and open-water swimming. It will also have a media compound for international competitions.

About 75,000 visitors are expected each year.

seven have designed the main Hub Building with a 50m (164ft) long glazed elevation overlooking the surfing lake, giving spectators clear views of the action from the restaurant and retail spaces. The building also contains the main reception, equipment hire and changing facilities.

The Family Activity Building contains a multi-decked children’s assault course and coffee shop overlooking the activity lagoon to enable spectators to watch ‘blobbing’ and the waterslides.

The Camp Site Amenity Building houses the campsite reception and office, lifeguard welfare facilities and WCs / showers for campers. There will also be camping accommodation and sleeping ‘pods’ located along the lake’s waterfront.

Visitors can try the obstacle course, equipped with inflatables and overhangs, at the activity lagoon. Catering includes a lagoon-side café, restaurant and bar serving locally sourced food.

Larger lodges will also be built and will retain the natural character of the woodlands surrounding the lake.

Despite the majestic surroundings, the facility is being built on the site of a former aluminium factory. Surf Snowdonia is recycling and re-using the materials on the construction site and using 100 per cent rainwater to fill the surf lake.

Surf Snowdonia is being developed by Conwy Adventure Leisure Ltd. There have previously been a number of proposals for adventure sports developments in Snowdonia, but most have remained on the drawing board.



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Hoshino Resorts combats summer heat with medically-supervised cool bathing programme for KAI onsen
Hoshino Resorts combats summer heat with medically-supervised cool bathing programme for KAI onsen   09 Jun 2026

Hoshino Resorts has developed a “Cool-down onsen soak” programme at properties with Japanese onsen facilities – those within the company’s KAI .... more>>

Peloton signals potential move into reformer Pilates with Skōp acquisition
Peloton signals potential move into reformer Pilates with Skōp acquisition   09 Jun 2026

Peloton has made the strategic acquisition of Pilates start-up, Skōp, to support the expansion of its strength ecosystem.

....
more>>
Rainforest immersion and mindfulness are on offer at The Ritz-Carlton, Langkawi, for Global Wellness Day
Rainforest immersion and mindfulness are on offer at The Ritz-Carlton, Langkawi, for Global Wellness Day   09 Jun 2026

The Ritz-Carlton, Langkawi, in Malaysia, has revealed a schedule for Global Wellness Day (GWD) that includes guided rainforest walks, mindful .... more>>

Crunch Fitness creates more affordable reformer Pilates concept
Crunch Fitness creates more affordable reformer Pilates concept   09 Jun 2026

Crunch Fitness has announced the launch of Crunch Reform Pilates – its own reformer concept designed to bring this fast growing, but rather .... more>>

As the 20th State of the Industry Report is released, LeisureDB rebrands to Evolve
As the 20th State of the Industry Report is released, LeisureDB rebrands to Evolve   08 Jun 2026

The 20th State of the Industry Report from LeisureDB has revealed a resilient, expanding and competitive sector, the importance of .... more>>

Longevitix launches AI-powered platform to deliver longevity medicine at scale
Longevitix launches AI-powered platform to deliver longevity medicine at scale   08 Jun 2026

Longevitix, a clinical platform for preventive and longevity medicine, has launched its AI-powered intelligence system to help physicians deliver .... more>>

Company profile


PSLT Ltd

PSLT Fitness Solutions manufacture, remanufacture and buy back commercial gym equipment.

View full profile>>

Catalogue gallery


Featured Supplier

CoverMe extends matching service to personal training, rewriting how members and personal trainers connect

CoverMe extends matching service to personal training, rewriting how members and personal trainers connect

CoverMe, the global leader in fitness workforce management, today launches CoverMe PT, an on-demand personal training platform that connects the right personal trainer to the right client in under 10 seconds. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Membership Advisor
Salary: Competitive salary plus commission & benefits
Location: Market Rasen
Company: Everyone Active
Customer Service Advisor
Salary: Competitive
Location: Market Rasen
Company: Everyone Active
GP Exercise Referral Instructor
Salary: £33,000pa + benefits
Location: Harrow
Company: Everyone Active
Diary dates
Powered by leisurediary.com

09-11 Jun 2026

World Sauna Forum 2026

Savutuvan Apaja, Haapaniemi, Finland







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd