NEWS
Construction begins on Kengo Kuma's National Stadium for 2020 Tokyo Olympics
POSTED 13 Dec 2016 . BY Kim Megson
Kuma chose a wooden lattice design for the stadium that evokes traditional styles seen in Japanese shrines and pagodas Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
The new stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour
– Shinzo Abe, Japan prime minister
Construction work has kicked off on Tokyo’s new National Stadium, the Kengo Kuma-designed stage for the 2020 Olympics and Paralympics.

The design by the Japanese architect was chosen to replace Zaha Hadid Architects’ original scheme – ostensibly due to the rising cost of that project – in December 2015, and received the green light two months ago. Kuma’s stadium is estimated to cost 150bn yen ($1.5bn, €1.3bn, £1.1bn) to build.

Construction company Taisei Corp and building planner Azusa Sekkei Co have been contracted to complete the work, which is being overseen by the Japan Sport Council – organiser of the Games. The project is expected to be finished by the end of November 2019.

Kuma chose a wooden lattice design for the stadium, which evokes traditional styles seen in
Japanese shrines and pagodas and blends in with the surrounding forests through its heavy use of landscaping. The structure will use Japanese-grown larch in its wood as well as steel composite roof and prefabricated panels to minimise costs and ensure a relatively quick construction timeline.

Speaking at the groundbreaking ceremony, Japan’s prime minister, Shinzo Abe, said: “The new image of the stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour. I’m very confident that this can be the stronghold of sports and culture for the new era.

“When we scrapped the original plan last July, I vowed to make the new venue one that will be celebrated by the people and the athletes, a place that can generate dreams and inspiration.”

Recently-elected Tokyo governor Yuriko Koike, who has been a vocal critic of the bloated costs of hosting the Olympics, said that the National Stadium will symbolise “the legacy of the Games and environmental sustainability,” adding, “I hope it will be loved by people for a long time to come.”

Earlier this year Kuma told Sports Management's sister title CLAD that he wants the new stadium, and the 2020 Games more broadly, to symbolise today’s Japan – a country “whose culture and direction is totally opposite to what went before” due to a slowing down of both economic growth and the pace of life.

“This new direction can be called the age of maturity,” he said. “People are finding a new, slower kind of lifestyle. But slowdown is not bad. Slowdown is creating new types of culture, new types of lifestyle. Actually, when you look at Japanese history, it is not a history of expansion. We’re basically very slow and very quiet, and I’m happy to see us go back to that time of quietness.

“For the stadium, I have used a lot of wood because I think it’s an appropriate material to symbolise this change. We once lived together and aged together with wood. I want to go back to that kind of natural circulation with my work.”
Construction on the stadium has now begun in Tokyo's Shinjuku Ward Credit: Kyodo News via AP
Government and city officials, and architect Kengo Kuma (far left), turn on the switch during a groundbreaking ceremony Credit: AP/Press Association Images
The design also uses landscaping to blend in with the surrounding trees Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
The stadium is expected to be finished by November 2019 Credit: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates
Japanese prime minister Shinzo Abe said: 'I’m very confident that this stadium can be the stronghold of sports and culture for the new era' Credit: AP Photo/Shizuo Kambayashi
RELATED STORIES
  FEATURE: Interview: Kengo Kuma


The Tokyo Olympic Stadium designer shares his philosophies
  Defiant Kuma's Tokyo Olympic Stadium granted green light


The Japanese government has approved a 150bn yen ($1.5bn) contract allowing work to begin on Kengo Kuma’s 2020 Tokyo Olympic Stadium.
  Maki and Kuma campaign for Tokyo gymnasium to receive UNESCO recognition


A group of Japanese architects, including Fumihiko Maki and Kengo Kuma, are petitioning UNESCO to recognise the gymnasium building designed by Kenzo Tange for the 1964 Tokyo Olympics on its World Cultural Heritage list.
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2026

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - Construction begins on Kengo Kuma's National Stadium for 2020 Tokyo Olympics...
15 Jun 2026 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

13 Dec 2016

Construction begins on Kengo Kuma's National Stadium for 2020 Tokyo Olympics
BY Kim Megson

Kuma chose a wooden lattice design for the stadium that evokes traditional styles seen in 
Japanese shrines and pagodas

Kuma chose a wooden lattice design for the stadium that evokes traditional styles seen in Japanese shrines and pagodas
photo: Taisei Corporation, Azusa Sekkei Co., Ltd. and Kengo Kuma and Associates

Construction work has kicked off on Tokyo’s new National Stadium, the Kengo Kuma-designed stage for the 2020 Olympics and Paralympics.

The design by the Japanese architect was chosen to replace Zaha Hadid Architects’ original scheme – ostensibly due to the rising cost of that project – in December 2015, and received the green light two months ago. Kuma’s stadium is estimated to cost 150bn yen ($1.5bn, €1.3bn, £1.1bn) to build.

Construction company Taisei Corp and building planner Azusa Sekkei Co have been contracted to complete the work, which is being overseen by the Japan Sport Council – organiser of the Games. The project is expected to be finished by the end of November 2019.

Kuma chose a wooden lattice design for the stadium, which evokes traditional styles seen in
Japanese shrines and pagodas and blends in with the surrounding forests through its heavy use of landscaping. The structure will use Japanese-grown larch in its wood as well as steel composite roof and prefabricated panels to minimise costs and ensure a relatively quick construction timeline.

Speaking at the groundbreaking ceremony, Japan’s prime minister, Shinzo Abe, said: “The new image of the stadium will realise ‘an athlete first’ policy with the best universal design in the world and some Japanese flavour. I’m very confident that this can be the stronghold of sports and culture for the new era.

“When we scrapped the original plan last July, I vowed to make the new venue one that will be celebrated by the people and the athletes, a place that can generate dreams and inspiration.”

Recently-elected Tokyo governor Yuriko Koike, who has been a vocal critic of the bloated costs of hosting the Olympics, said that the National Stadium will symbolise “the legacy of the Games and environmental sustainability,” adding, “I hope it will be loved by people for a long time to come.”

Earlier this year Kuma told Sports Management's sister title CLAD that he wants the new stadium, and the 2020 Games more broadly, to symbolise today’s Japan – a country “whose culture and direction is totally opposite to what went before” due to a slowing down of both economic growth and the pace of life.

“This new direction can be called the age of maturity,” he said. “People are finding a new, slower kind of lifestyle. But slowdown is not bad. Slowdown is creating new types of culture, new types of lifestyle. Actually, when you look at Japanese history, it is not a history of expansion. We’re basically very slow and very quiet, and I’m happy to see us go back to that time of quietness.

“For the stadium, I have used a lot of wood because I think it’s an appropriate material to symbolise this change. We once lived together and aged together with wood. I want to go back to that kind of natural circulation with my work.”



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Les Mills calls on the industry to support UNICEF
Les Mills calls on the industry to support UNICEF   12 Jun 2026

Global group exercise specialist, Les Mills, is inviting operators to sign up to its Workout for the World event on 20 June, in support of .... more>>

Belgin Aksoy prepares to mark 15 years of Global Wellness Day on Saturday 13 June
Belgin Aksoy prepares to mark 15 years of Global Wellness Day on Saturday 13 June   12 Jun 2026

Global Wellness Day (GWD) will mark its 15th anniversary on Saturday 13 June 2026, with the theme: #JoyMagenta – a celebration of the healing .... more>>

HUM2N opens longevity clinic at Six Senses London
HUM2N opens longevity clinic at Six Senses London   12 Jun 2026

Global luxury hospitality brand, Six Senses, has partnered with longevity healthcare provider, HUM2N, to launch a clinic at Six Senses London, at .... more>>

Mayrlife opens first hotel day clinic in partnership with Rosewood Vienna
Mayrlife opens first hotel day clinic in partnership with Rosewood Vienna   11 Jun 2026

As part of its first hotel partnership, Mayrlife – the medical health resort company known for its site in Altaussee, Austria – has launched a day .... more>>

KX Chelsea invests £15 million to upgrade its wellness offering
KX Chelsea invests £15 million to upgrade its wellness offering   10 Jun 2026

Premium London health club, KX Chelsea, is gearing up to unveil its most significant redevelopment since its launch in 2002.

....
more>>
Researchers identify a drug which reduces muscle loss when using GLP-1 medications
Researchers identify a drug which reduces muscle loss when using GLP-1 medications   10 Jun 2026

Researchers in the US have identified an antibody which could greatly reduce the loss of lean muscle mass in people who are taking weight-loss .... more>>

Company profile


Technogym UK Ltd

Founded in 1983, Technogym is a world leader brand in fitness, wellness, sport and health.

View full profile>>

Catalogue gallery


Featured Supplier

Glow beyond protection: meet Comfort Zone Hydramemory Hybrid Glow SPF 30

Glow beyond protection: meet Comfort Zone Hydramemory Hybrid Glow SPF 30

Sun protection is no longer just about shielding the skin – it's about enhancing it. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Community Activator Coach Apprentice
Salary: 16,686
Location: Stowmarket, Suffolk
Company: Everyone Active
Membership Advisor
Salary: Competitive salary plus commission & benefits
Location: Market Rasen
Company: Everyone Active
Customer Service Advisor
Salary: Competitive
Location: Market Rasen
Company: Everyone Active
Diary dates
Powered by leisurediary.com

15-18 Jun 2026

HLTH Europe

RAI Convention Centre, Amsterdam, Netherlands







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd