NEWS
2020 opening schedule announced for new jungle habitats at Auckland Zoo
POSTED 15 Jul 2019 . BY Andy Knaggs
New Zealand's Auckland Zoo has revealed a timetable for opening each part of its new South East Asia Jungle Track project ‒ a NZ$58m (US$39m, €34.6m, £31m) investment that's part of the zoo's wider 10-year, NZ$150m (US$100.9m, €89.5m, £80.4m) evolution programme, funded by Auckland Council.

The development includes new habitats for new species from the south-east Asian jungle, including a high canopy for orangutans, gibbons and other primates, lowlands for tigers and otters, a swamp forest dome with a scientifically-engineered environment to mimic the hot and humid Tropics, where the Sunda gharial (Asian crocodile) and a range of other reptiles and fish will live, and lake and wetlands with an extended climbing range for arboreal primates.

On a more functional level, a new 1,000sq m (3,280sq ft) cafe and function venue is being built, with views of the lake and wetlands habitat, while infrastructure services such as power, gas, data and water will be renewed.

The zoo has worked with Studio Hansen Roberts on the design of the South East Asia Jungle Track, with NZ Strong (builders), Jacobs Engineering and Beca Group (project strategy and delivery) also part of the team.

The schedule announced sees the cafe and function venue open around Christmas 2019; the high canopy should open during the New Zealand summer (December 2019-February 2020), followed by the lowlands in the winter (June to August) and the tropical dome in springtime (September to November 2020).

Visitors will be offered a "highly immersive journey through four distinct habitats spread across one-fifth of the zoo", said Auckland Zoo, and will be able to "discover and connect" with some of South East Asia's most spectacular and threatened wildlife. This will be delivered partly through "shared shelters", where visitors can get up close to the animals.

In the final phase of the development programme, slated for 2021 to 2022, the zoo said it will develop a refreshed South American trail, new entry and family facilities, and an African Forest track.
In a climate-controlled dome, Asian crocodiles and other reptiles and fish will thrive in hot and humid conditions Credit: Auckland Zoo
A new cafe and function venue will be the first part of the new development to open Credit: Auckland Zoo
Auckland Zoo promises an immersive experience for visitors Credit: Auckland Zoo
Aerial pathways for arboreal primates stretch between a series of 23m-high poles Credit: Auckland Zoo
 


CONTACT US

Leisure Media, Portmill House, Portmill Lane,
Hitchin, Hertfordshire SG5 1DJ Tel: +44 (0)1462 431385

©Cybertrek 2019

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - 2020 opening schedule announced for new jungle habitats at Auckland Zoo...
17 Aug 2019 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

15 Jul 2019

2020 opening schedule announced for new jungle habitats at Auckland Zoo
BY Andy Knaggs

The lowland habitat includes elevated vantage points for tigers

The lowland habitat includes elevated vantage points for tigers
photo: Auckland Zoo

New Zealand's Auckland Zoo has revealed a timetable for opening each part of its new South East Asia Jungle Track project ‒ a NZ$58m (US$39m, €34.6m, £31m) investment that's part of the zoo's wider 10-year, NZ$150m (US$100.9m, €89.5m, £80.4m) evolution programme, funded by Auckland Council.

The development includes new habitats for new species from the south-east Asian jungle, including a high canopy for orangutans, gibbons and other primates, lowlands for tigers and otters, a swamp forest dome with a scientifically-engineered environment to mimic the hot and humid Tropics, where the Sunda gharial (Asian crocodile) and a range of other reptiles and fish will live, and lake and wetlands with an extended climbing range for arboreal primates.

On a more functional level, a new 1,000sq m (3,280sq ft) cafe and function venue is being built, with views of the lake and wetlands habitat, while infrastructure services such as power, gas, data and water will be renewed.

The zoo has worked with Studio Hansen Roberts on the design of the South East Asia Jungle Track, with NZ Strong (builders), Jacobs Engineering and Beca Group (project strategy and delivery) also part of the team.

The schedule announced sees the cafe and function venue open around Christmas 2019; the high canopy should open during the New Zealand summer (December 2019-February 2020), followed by the lowlands in the winter (June to August) and the tropical dome in springtime (September to November 2020).

Visitors will be offered a "highly immersive journey through four distinct habitats spread across one-fifth of the zoo", said Auckland Zoo, and will be able to "discover and connect" with some of South East Asia's most spectacular and threatened wildlife. This will be delivered partly through "shared shelters", where visitors can get up close to the animals.

In the final phase of the development programme, slated for 2021 to 2022, the zoo said it will develop a refreshed South American trail, new entry and family facilities, and an African Forest track.



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Emma Darby named COO of Resense
Emma Darby named COO of Resense   16 Aug 2019

Leading wellness consultancy Resense has announced the promotion of Emma Darby to the position of chief operating officer (COO). Darby benefits .... more>>
Australian Museum closes for year-long AUS$57.5m renovation
Australian Museum closes for year-long AUS$57.5m renovation   16 Aug 2019

A major renovation project that will expand touring exhibition halls and create several new facilities at the Australian Museum in Sydney will see the .... more>>
ISPA research: More men visiting spas than ever before
ISPA research: More men visiting spas than ever before   16 Aug 2019

Research by the International Spa Association (ISPA), has revealed that more men are going to spas than ever before, with stats indicating that 49 per .... more>>
The Lancet: social media preventing teenagers being physically active – and affecting their mental health
The Lancet: social media preventing teenagers being physically active – and affecting their mental health   16 Aug 2019

Teenagers' 'incessant' use of social media is radically reducing the time they spend sleeping and exercising – and could have a detrimental effect on .... more>>
Silver Dollar City announces record-breaking waterfall drop ride among US$30m plans
Silver Dollar City announces record-breaking waterfall drop ride among US$30m plans   16 Aug 2019

The tallest raft ride drop in the Western Hemisphere is coming to Silver Dollar City, after the park revealed plans to invest more than US$30m .... more>>
Global Wellness Summit relocates from Hong Kong to Singapore
Global Wellness Summit relocates from Hong Kong to Singapore   15 Aug 2019

Susie Ellis, chair of the Global Wellness Institute, has announced the 2019 Global Wellness Summit will move from Hong Kong to Singapore. Dates will .... more>>
Company profile


Dyaco UK Ltd

We cater for all markets, aiming to be at the cutting edge of developments in the industry to react accordingly and provide operators and gym users with the equipment they need and want.

View full profile>>

Catalogue gallery


Featured Supplier

Hand Picked Hotels launches The Hive to improve work/life balance for employees

Hand Picked Hotels launches The Hive to improve work/life balance for employees

Independent country house hotel group, Hand Picked Hotels, has partnered with Reward Gateway to launch a new bespoke interactive platform. More>>




in this issue

• Bridges acquires énergie Fitness
• Huw Edwards named CEO of ukactive
• Horniman Museum revamp plans unveiled



Latest jobs

Jobs Search



Cleaners
Salary: Competitive
Location: Queensway, London, UK
Company: Everyone Active
Personal Trainer Energie Fitness Borough
Salary: £40-60/hour
Location: Borough SE1, UK
Company: énergie group
Personal Trainer / Fitness Trainer
Salary: 100% of your PT earnings
Location: Watford, UK
Company: The Gym Group
Diary dates
Powered by leisurediary.com




03 Sep 2019

Spa Business Bootcamp Course

Laico Hotels & Resorts Regency, Nairobi, Kenya



Leisure Management magazine 2018 issue 1
Leisure Management
2018 issue 1

View issue contents
View on turning pages
Download PDF
  Arts & Culture: The show must go on
When austerity hits hard, UK theatres adapt and get creative More>>
  Interview: Louis D’Amore
Louis D’Amore on the work of the International Institute for Peace through Tourism More>>


Leisure Management magazine 2016 issue 1

Leisure Management
2016 issue 1

View issue contents
View turning pages
Download PDF
  Editor’s letter: Failing the elderly
Liz Terry shares her thoughts More>>
  Interview: Tony Butler
Derby Museums Trust executive director delivers social justice in museums More>>


Published by The Leisure Media Company Ltd Portmill House, Portmill Lane, Hitchin, Herts SG5 1DJ. Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd