NEWS
Seattle Aquarium gains city funding approval for new US$113m shark and stingray pavilion
POSTED 10 Dec 2019 . BY Andy Knaggs
The Seattle Aquarium is expected to attract more than a million visitors a year once the city's waterfront development is complete Credit: LMN Architects
Construction of a new pavilion at the Seattle Aquarium looks set to go ahead after the city council approved a US$34m (€30.7m, £25.8m) contribution towards the project.

The US$113m (€102m, £85.8m) 50,000sq ft (15,240sq m) Ocean Pavilion development will see a 325,000-gallon martini glass-shaped tank built to house sharks, stingrays, and schooling and reef fish from the South Pacific's Coral Triangle area. Currently, around 850,000 people visit the aquarium every year, and it's hoped that the new pavilion would allow it to serve at least 1.2 million visitors annually.

Aquarium Society, which owns the attraction, is planning to raise US$60m (€54.2m, £45.5m) in private donations, with the remaining US$19m (€17.2m, £14.4m) to come from other public funds, according to The Seattle Times. The project will be part of a wider redevelopment of the Seattle waterfront that aims to triple the number of visitors to Seattle's downtown piers and increase attendance at the aquarium.

A key aspect of the redevelopment will be "Overlook Walk" – a park-like ramp that will connect the hillside Pike Place Market to the waterfront below, via Ocean Pavilion's rooftop.

Pedestrians walking along the promenade would be able to look up through a circle of glass into the new aquarium tank, while a similar glass portal on top would let in sunlight and give people on the roof of the pavilion a view into the tank.

Seattle firm LMN Architects have created the designs for Ocean Pavilion, with Turner Construction also appointed by the aquarium; Hoffman Construction has been engaged to build the US$100m (€90.3m, £75.9m) Overlook Walk.

Both projects are scheduled to start in 2021, with Ocean Pavilion expected to take two years to construct.

"The new waterfront is as significant as Central Park is in Manhattan," said Mark Reddington, partner with LMN Architects, who designed Ocean Pavilion. "It will be one of the biggest transformations in Seattle's history."
Overlook Walk (left) will connect Seattle's Pike Place Market to the new promenade, via the roof of Ocean Pavilion (right) Credit: LMN Architects
Sharks, stingrays and different species of fish will help educate visitors about human and climate-related threats in the South Pacific Credit: LMN Architects
 


CONTACT US

Leisure Media
Tel: +44 (0)1462 431385

©Cybertrek 2024

ABOUT LEISURE MEDIA
LEISURE MEDIA MAGAZINES
LEISURE MEDIA HANDBOOKS
LEISURE MEDIA WEBSITES
LEISURE MEDIA PRODUCT SEARCH
PRINT SUBSCRIPTIONS
FREE DIGITAL SUBSCRIPTIONS
 
Leisure Management - Seattle Aquarium gains city funding approval for new US$113m shark and stingray pavilion...
04 May 2024 Leisure Management: daily news and jobs
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

10 Dec 2019

Seattle Aquarium gains city funding approval for new US$113m shark and stingray pavilion
BY Andy Knaggs

The Seattle Aquarium is expected to attract more than a million visitors a year once the city's waterfront development is complete

The Seattle Aquarium is expected to attract more than a million visitors a year once the city's waterfront development is complete
photo: LMN Architects

Construction of a new pavilion at the Seattle Aquarium looks set to go ahead after the city council approved a US$34m (€30.7m, £25.8m) contribution towards the project.

The US$113m (€102m, £85.8m) 50,000sq ft (15,240sq m) Ocean Pavilion development will see a 325,000-gallon martini glass-shaped tank built to house sharks, stingrays, and schooling and reef fish from the South Pacific's Coral Triangle area. Currently, around 850,000 people visit the aquarium every year, and it's hoped that the new pavilion would allow it to serve at least 1.2 million visitors annually.

Aquarium Society, which owns the attraction, is planning to raise US$60m (€54.2m, £45.5m) in private donations, with the remaining US$19m (€17.2m, £14.4m) to come from other public funds, according to The Seattle Times. The project will be part of a wider redevelopment of the Seattle waterfront that aims to triple the number of visitors to Seattle's downtown piers and increase attendance at the aquarium.

A key aspect of the redevelopment will be "Overlook Walk" – a park-like ramp that will connect the hillside Pike Place Market to the waterfront below, via Ocean Pavilion's rooftop.

Pedestrians walking along the promenade would be able to look up through a circle of glass into the new aquarium tank, while a similar glass portal on top would let in sunlight and give people on the roof of the pavilion a view into the tank.

Seattle firm LMN Architects have created the designs for Ocean Pavilion, with Turner Construction also appointed by the aquarium; Hoffman Construction has been engaged to build the US$100m (€90.3m, £75.9m) Overlook Walk.

Both projects are scheduled to start in 2021, with Ocean Pavilion expected to take two years to construct.

"The new waterfront is as significant as Central Park is in Manhattan," said Mark Reddington, partner with LMN Architects, who designed Ocean Pavilion. "It will be one of the biggest transformations in Seattle's history."



Connect with
Leisure Management
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Breakers Hotel in Long Beach to relaunch as Fairmont property with tech-forward spa in 2024
Breakers Hotel in Long Beach to relaunch as Fairmont property with tech-forward spa in 2024   03 May 2024

The historic Breakers Hotel in Long Beach, California, is set to reopen in mid-2024 as a Fairmont Hotels & Resorts property after a significant .... more>>
Kempinski to make Vietnamese debut with riverside resort and spa designed by Kengo Kuma
Kempinski to make Vietnamese debut with riverside resort and spa designed by Kengo Kuma   03 May 2024

High-end five-star hotel company Kempinski Hotels is making its mark in Vietnam with a luxury waterfront property overlooking the Saigon River. Set .... more>>
Belgian start-up, Moonbird, is on a mission to teach the world to breathe
Belgian start-up, Moonbird, is on a mission to teach the world to breathe   02 May 2024

Moonbird is a tactile breathing coach, which provides real-time biofeedback, measuring heart rate and heart rate variability. Studies show it can .... more>>
Barry’s considers next investor move, as North Castle Partners looks to exit
Barry’s considers next investor move, as North Castle Partners looks to exit   02 May 2024

Barry’s – known for its HIIT workouts combining treadmills and weights – is thought to be looking at strategic options, including taking on a new .... more>>
Providence Equity Partners takes control of VivaGym and its Fitness Hut brand
Providence Equity Partners takes control of VivaGym and its Fitness Hut brand   30 Apr 2024

US private equity fund, Providence Equity Partners, is acquiring a majority stake in VivaGym from Bridges Fund Management, which will exit as a .... more>>
Marriott to realise Ritz-Carlton Reserve at Trojena, the Mountains of Neom
Marriott to realise Ritz-Carlton Reserve at Trojena, the Mountains of Neom   01 May 2024

Marriott International has signed a new deal with Neom to open a Ritz-Carlton Reserve property as part of Trojena, a brand new year-round mountain .... more>>
Company profile


miha bodytec

Founded in 2007 in Gersthofen, Germany, miha bodytec is the market-leading supplier of Electro Muscle Stimulation (EMS) equipment.

View full profile>>

Catalogue gallery


Featured Supplier

CSI Design Expo Americas 2024 announces new Attractions & Entertainment Technology Zone

CSI Design Expo Americas 2024 announces new Attractions & Entertainment Technology Zone

Cruise Ship Interiors (CSI) invites cruise lines, shipyards, design studios, outfitters, and suppliers to take part in CSI Design Expo Americas in Miami, Florida, the region’s only event dedicated to cruise ship interior design. More>>




in this issue

• Virgin gets right to wipe out rent arrears
• Fitness industry mourns passing of Jan Spaticchia
• STA offers mindfulness resources



Latest jobs

Jobs Search



Duty Manager
Salary: Competitive
Location: Middlesbrough
Company: Everyone Active
Duty Manager Golf and Athletics
Salary: £30,027pa + non-contrib pension + benefits
Location: Stockwood Park Golf Club, London Road, Luton, UK
Company: Active Luton
Leisure Centre Duty Manager
Salary: £24,687.57pa + pension + health care + benefits
Location: Uppingham, Oakham, UK
Company: Uppingham School
Diary dates
Powered by leisurediary.com

08-08 May 2024

Hospitality Design Conference

Hotel Melià , Milano , Italy







Published by Leisure Media Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd